Jagannath Warriors Residencya

FLOORING
Entire of Marble Flooring/ Vitrified With 4’’Dado.

KITCHEN
Marble Flooring  /Vitrified Green Marble Platform with built-in sink,Glazed wall tile up to 36”  height Over platform and kitchen cupboard. One water purifier point and one exhaust fan point.

DOORS
Main door of well design Teak veneer flush door with brass fitting, Eye peep and safety chain, inside doors will be flush type with salwood choukath.

WINDOWS
Aluminum windows with glass panel and grill.

LIGHTING
Concealed wiring network of “ Finolex, Anchor or Havells” make electrical fitting/switches of “Anchor or Havells”

TOILETS
Flooring of Anti-skid floor tiles. Glazed wall tiles up to 6’o” height form floor. Ceramic ware of Neycer or paryware and C.P fitting of jaguar Premium range” Geyser point in toilet.

FOUNDATION
Foundation with R.C.C and wall with first class K.B Brichs and plastering on wall.

PAINTS
Cement paint on exteriors. One coat of plaster of Paris in interior.

AMENTIES

  • AC gym
  • Temple
  • Jugging track
  • Club house
  • Children Play Area
  • Lawn
  • etc………….

OTHERS

  • Taja in a bedrooms.
  • Boundary wall will be up to 4’0” height.
  • S.S hand rail
  • Anti termite treatment in the plinth area.
  • One washing machine point
  • One wash basin in drawing /dining.
  • One wash basin in MBR toilet.
  • All main door cover with M.S grill.
  • Deep bore well with submersible pump set.
  • Over hand water tank SINTEX, Precast R.C.C Round tank of 2000 ltr.

N.B additional cost of alteration to be borne by the customer.
N.B Time of Completion 1.5 year.

SCHEDULE OF PAYMENT

    Initial booking amount ………………………………………………………………..… Rs. 50,000 .
    1st installment within 30 days of allotment ……………………………………..…. @25%.
    2nd installment on completion of 1st slab of respective unit………………@20%.
    3rd installment on completion of 2nd slab of respective unit………………@15%.
    4th installment on completion of brick work of respective unit………….@15%.
    5th installment on completion of flooring work of respective unit…… @ 10%
    6th instakkment on completion of Electrical & PH work……………….……..@10%.
    7th installment on completion ………………………………………………………………..@5%.