Jagannath Height

FLOORING
Entire of Marble Flooring/ Vitrified With 4’’Dado.

KITCHEN
Marble Flooring  /Vitrified Green Marble Platform with built-in sink,Glazed wall tile up to 36”  height Over platform and kitchen cupboard. One water purifier point and one exhaust fan point.

DOORS
Main door of well design Teak veneer flush door with brass fitting, Eye peep and safety chain, inside doors will be flush type with salwood choukath.

WINDOWS
Aluminum windows with glass panel and grill.

LIGHTING
Concealed wiring network of “ Finolex, Anchor or Havells” make electrical fitting/switches of “Anchor or Havells”

TOILETS
Flooring of Anti-skid floor tiles. Glazed wall tiles up to 6’o” height form floor. Ceramic ware of Neycer or paryware and C.P fitting of jaguar Premium range” Geyser point in toilet.

FOUNDATION
Foundation with R.C.C and wall with first class K.B Brichs and plastering on wall.

PAINTS
Cement paint on exteriors. One coat of plaster of Paris in interior.

OTHERS

  • Taja in a bedrooms.
  • Boundary wall will be up to 6’0” height.
  • Anti-termite treatment is providing in plinth area.
  • Inter–com Facility.
  • One washing machine point
  • One wash basin in drawing /dining.
  • One wash basin in MBR toilet.
  • All main door cover with M.S grill.
  • One community hall and one common toilet.
  • D.G set for common Area.
  • Inverter  to each flat.

N.B additional cost of alteration to be borne by the customer.

SCHEDULE OF PAYMENT

    Initial Booking amount ………………………………………………………………..… Rs. 2,00,000 .
    1st installment Due @30% Of unit cost on the date of allotment including initial booking Amount.
    2nd installment @15% of unit cost on completion of first slab of respective unit.
    3rd installment @15% of unit cost on completion of second slab of respective unit.
    4th installment @10% of unit cost on completion of third slab of the respective unit.
    5th installment @10% of unit cost on completion of fourth slab of the of respective unit.
    6th installment @10% of unit cost on completion of fifth slab of the of respective unit.
    7th installment @5% on Completion of flooring work of respective unit.
    8th installment @5% on Completion.